IMG_6775-1.jpegWe are pleased to advise the building structure has topped out at level 7 with the steel top level roof next to be installed. The sweeping views from most levels are breathtaking taking in the city to the north and Caulfield racecourse and Port Phillip Bay to the south.

Plaster and services are now being installed in levels 1-3 
working up the building to level 7. 

IMG_6770-1.jpeg

Construction is continuing well with the anticipated construction completion in October this year. 